universities and research institutes in production, learning, and research, continuously carry out technological innovation and production improvement, and combine the needs of many metal precision parts manufacturing enterprises to adopt innovation Design ideas, advanced manufacturing technology, R&D and production: servo CNC high-precision leveling machine, hydraulic high-precision leveling machine, four (six) heavy-duty leveling machine, automatic loading and unloading manipulator, robot, laser leveling detector, High-precision uncoiling, leveling, stamping and shearing
Others Derscription
1.Warranty period: the supplier guarantees that the above products provided to the demander are brand-new products of the original factory; And for the above products, the warranty period is one year; During the warranty period, in case of non-human mechanical failure, natural damage and other conditions of the supplier's products under normal use, the supplier shall be responsible for free maintenance or replacement; In case of failure caused by improper warranty and force majeure, the Demander shall charge the cost as appropriate;
2.Payment method: 40% advance payment, 60% balance payment after supplier's acceptance and before shipment;
3.Place of delivery: the place of delivery is the location of the demander's company or the place designated by the demander (domestic).
4.Transportation and insurance: before the goods arrive at the demander's company, the risk of goods loss and loss shall be borne by the supplier; After being handed over to the demander's company, all risks shall be borne by the demander. The transportation expenses from the supplier to the Demander shall be borne by the supplier.
5.Delivery time: 7 days after receiving the advance payment;
6.Packaging requirements: the supplier undertakes to package the products according to the packaging method of the above products when they leave the factory, or ensure that the products are not damaged; When taking delivery of the contract equipment, Party A shall check the external packaging of the contract equipment. If the external packaging of the contract equipment is damaged or the equipment is seriously damaged, Party A shall immediately notify the supplier or reject it.
7. Acceptance criteria: 7.1-The acceptance shall be carried out according to the quality standards or enterprise production standards agreed in the contract. In case of any objection, a written notice shall be submitted to the supplier within 7 days after the arrival of the products. If no written objection is raised within the time limit, it shall be deemed as default acceptance;
7.2- Within one month after the completion of equipment installation and commissioning, if the acceptance procedure cannot be completed due to the supplier's factors, the demander will be deemed to have accepted the equipment by default.
7.3- Acceptance items: after the equipment is assembled and debugged in the supplier's factory, notify the demander to arrive at the site for acceptance with samples, and deliver the equipment to the demander's factory after passing the pre acceptance. After installation and commissioning in the buyer's factory, notify the buyer of acceptance, and both parties sign the acceptance certificate.
8. Modification and change of contract: during the execution of this contract, if there are matters not covered or need to be modified or changed, the supplier and the Demander shall negotiate and sign a supplementary agreement attached to this contract. All supplementary provisions have the same legal effect as the contract.
9. Ownership retention: the supplier has the ownership of the products for which the demander has not paid the full payment. Once the payment is settled, the ownership of the products belongs to the demander;
10. Liability for breach of contract: in case of any dispute arising from the performance of this contract, the supplier and the supplier need to resolve it through negotiation. If the negotiation cannot be resolved, it shall be under the jurisdiction of the people's court in the place where the supplier is located and resolved through litigation;
11. This agreement is made in duplicate, with Party A and Party B holding one respectively. It will come into force after being sealed and signed.
12. Faxes and photocopies have the same legal effect.
13. Installation: when the equipment arrives at the demander's site, the demander is responsible for unloading and positioning the machine tool, and the supplier sends personnel to assist; The supplier shall be responsible for the installation of the equipment, and the Demander shall provide relevant electricity and operators for installation and commissioning.